[edit] Why use Business Focused Maintenance?
Why do we do maintenance? Is it to keep our assets in optimum working condition? Do we do it to make the equipment last longer? Perhaps the main goal is to prevent failures? If it is for any of these reasons you may find that you are working to an outdated ethos…
BSRIA has recognised and employ a more pragmatic approach for today’s business needs. Business Focused Maintenance (BFM) recognises that building services’ equipment is installed to provide a service, thereby allowing a business function to be maintained. It analyses the business needs and consequences of failure first and foremost. This ensures that business function is maintained with the minimum of intrusive maintenance to minimise maintenance induced failure, otherwise it is traditionally assumed that the built environment’s asset failure follows the bathtub curve.
There are standard specifications for maintenance within the building services industry that have been updated over the years such as SFG20. This is used by many organisations to enable them to tender for outsourced maintenance on a like-for-like basis. The main drawback of this approach is that the maintenance delivered will be generic across the site. This can increase costs and/or reduce the availability of human resources. Couple this with the often-quoted statistic that “70% of failures are due to ineffective maintenance” and it begs the questions to be asked over purely time-based Planned Preventative Maintenance (PPM) frequencies.
BFM recognises that the need for maintenance generally arises from business needs such as:
- Complying with legislation
- Minimising health and safety risks
- Minimising business risks
- Managing business continuity
- Responding to business and customer requirements
- Adding value as part of the business process
- Reducing overall business costs
- Maximising whole life cost
- Increasing asset / system availability
- Increasing operational up time
Users of BFM – first published as a BSRIA Guide in 2004 – have demonstrated increased system availability and greatly reduced costs. There is a structured, six-step process to follow where the client and BSRIA work collaboratively to:
[edit] 1 Assess business needs and consequences of asset failure
The goals of the business and the needs of the end users are assessed to ascertain which assets are crucial, and therefore the impact on the business of assets failing. The structure of BFM allows for this task to be done as objectively as possible and logged on a numeric scale of 1-10. 1 is a low consequence and 10 is a high impact on business continuity.
[edit] 2 Document functional block diagrams and assess functional resilience
Review the systems and assess their ability to continue to meet the needs of the business when a failure occurs.
[edit] 3 Assess asset condition
A full condition survey as per BG 35/2012 taking into account all relevant influences on an assets condition, to provide a remaining life expectancy.
[edit] 4 Calculate likelihood of failure
Converts the alpha-numeric score from tasks 3 and 2 to a 1-10 score via conversion table 6 in the BFM guide BG 53/2016.
[edit] 5 Calculate BFM score
Combine the score from task 1 (BC) with the number calculated in task 4 (L) to give a BFM risk score on a scale of 1-100.
[edit] 6 Review of PPM tasks and frequency
Apply scores to the agreed level of risk set by the organisation. From this a revised maintenance schedule can be drawn up. BG 53/2016 suggests the following:
- 1-9 Discretionary maintenance for non-critical assets
- 10-40 Legal compliance and sector specific requirements
- 41-100 Maintenance to provide the greatest level of confidence in asset reliability, performance and availability.
Whilst every job is different, an indicative timeline can show you that BFM can very quickly make it’s impact on businesses.
The business-focused maintenance methodology challenges the planned preventative maintenance frequency of building services plant. The assessment methodology takes into account plant history (age, condition, failure history, plant loading, and maintenance history), the number of standby plant items (redundancy), and the level of resources available.
Many of the intrusive maintenance tasks can be replaced by Condition Monitoring (CM) which in turn leads to Condition Based Maintenance (CBM). The actual practice of CM is far quicker in terms of man hours than time-based PPMs and often involves zero down time to the asset and therefore no impact to the business. In addition to the usual array of gauges on an asset or its BMS sensor display that can be used to monitor plant performance, common CM methods include thermal imaging, vibration monitoring, acoustic emission monitoring and lubricant analysis.
Regular use of these methods at appropriate intervals can be far more cost effective than regular time-based generic intervals, whereas for non-critical plant, the most cost-effective maintenance methodology may be to run-to-failure. By applying the BFM methodology, you can be confident that you have selected the most appropriate maintenance technique for the services in your building.
This article originally appeared as ‘Why use Business Focused Maintenance?’ on the BSRIA blog, published on 3 March 2020. It was written by Nick Blake – Principal FM Consultant at BSRIA. You can download Business Focused Maintenance (BG53/2016) here.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- BSRIA articles on Designing Buildings Wiki.
- BSRIA.
- Building Services Analytics - BG 75 2018
- Business-Focused Maintenance BG53 2016.
- Carbon neutral contract.
- Design for maintenance.
- In-house or outsource maintenance.
- Maintenance and operational strategy.
- Maintenance.
- Maximising maintenance budgets after lockdown.
- O&M manual.
- Operation, maintenance and training (OMT).
- Planned preventive maintenance.
- Predictive maintenance.
- Proactive maintenance.
- Reliability centred maintenance.
- Repair and maintenance contract.
- Scheduled maintenance.
- Soft landings and business-focused maintenance.
- Unplanned maintenance.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.